What do you need before bulk production starts?
Confirm the approved sample, final specifications, size and colour breakdown, materials, branded components and packing requirements. Agree commercial terms, required approvals and the conditions for releasing the order into production.
How long does swimwear manufacturing take?
The indicative bulk production reference is 25–35 days after approvals and deposit, subject to material readiness and the agreed schedule. Confirm whether the quote uses calendar or working days, and separate the expected dispatch date from freight transit and arrival dates.
What is your MOQ for bulk swimwear production?
The starting garment MOQ shown on our site is 50 pieces per style and colour, subject to design and material confirmation. Custom fabrics, prints, hardware, labels and packaging may have separate minimums. Share the complete breakdown for review.
How do I check whether you can accommodate my order?
Provide the styles, quantities, size and colour split, construction requirements, material status and target dates. Production availability needs to be assessed against the actual order and schedule; sample approval alone does not reserve a bulk production slot.
Can I change the design after production is confirmed?
Raise the change as soon as possible. Its feasibility depends on which materials or operations are already committed. Confirm any effect on cost, lead time and completed work, then record the revised specifications and approval before the change is implemented.
How are production updates handled?
Agree the contact route, update frequency and review milestones when confirming the order. Useful updates can cover material readiness, production progress, open decisions, inspection and dispatch preparation. Confirm any photo or document requirements in advance.
Will the bulk order match my approved sample?
The approved sample and final specifications should be the agreed production references. Define measurement tolerances, material references and workmanship requirements before production, then agree the checks and release conditions used to assess the order.
Can I arrange an independent inspection?
Discuss the inspection provider, scope, timing and release requirements before ordering. Confirm site access, responsibility for fees and how findings or corrective actions will be handled within the production and shipment schedule.
How should I plan a repeat order?
Identify the original style and specification version, list any changes and provide the new assortment. Reconfirm fabric and trim availability, colour references, quantities, pricing and production dates instead of assuming the original conditions remain the same.